The Town Board just authorized Chazen Engineering to "perform a comprehensive evaluation of the Wastewater Treatment Plant specifically to address the responded to DEC regarding to the existing consent order, analysis of the present apparatus and operation, short and long term modifications to allow for increased capacity of the existing plant."
The Town Board just authorized Chazen Engineering to "perform a comprehensive evaluation of the Wastewater Treatment Plant specifically to address the responded to DEC regarding to the existing consent order, analysis of the present apparatus and operation, short and long term modifications to allow for increased capacity of the existing plant."
ReplyDeletePete Stenson